Use the same project workflow whenever crane work is planned on site, from construction and industrial work to infrastructure and data centers. Project Atlas is one fictional data center example.
The GC coordinates the package. Each employer records decisions for its workers. The designated lift director records release or hold.
Administrator: arrange a confirmed account, create the client organization/project and invite named employer representatives, reviewer and lift director.
Reviewer: register and approve applicable project sources/versions. Configure requirements and the source used for human lift classification.
Coordinator: open the project, choose Upload plan documents, and add one plan or all related files for the same operation.
Submitter: keep the page open while scanned pages are read. The project saves the originals, issues and concerns, and findings PDF together. Open the report and check uncertain readings against the originals.
Reviewer and submitter: return or correct findings, preserve unresolved issues, and review the latest revision. Document verification is separate from plan review.
Director: use the separate requirements/release workflow, carry out the field process, record changes/completion and freeze the closeout evidence.
Demo and client workspace
Available capabilities
Capability
Atlas demonstration
Your private workspace
Records and human decisions
Fictional records in a protected demonstration
Your project, role-controlled, persistent
Plan checks
Example plans and private plan uploads
Single-file or multi-file uploads, scanned-page reading, document and calculation checks, findings PDF and saved review history
Coordination
Fictional lift windows
Your scheduled windows and shared-resource review flags; no collision analysis
Site map, alert wall and forecast comparison
Illustrative work areas and advisory examples
Advisory NWS weather for explicitly confirmed US jobsite coordinates and time zone. No client map or GPS locations are generated. Weather does not authorize lifting.
Supported originals: PDF, PNG and JPEG. Upload one document or up to 30 related files as one package. Scanned pages are read with OCR. The report identifies concerns and uncertain readings for review; drawings, handwriting and signatures may need confirmation. If you need to record an operational lift, confirm its figures and page references in the separate lift record.
Your team adds its project details and documents directly in the private workspace. Each submitted package keeps its own originals, report and review history.
CraneQualified provides
The hosted workspace and an arranged sign-in account.
Project invitations and access controls.
Record checks, review workflows, and this field guide.
Retrievable evidence packets and original documents.
Your project team adds
The GC, project, contractors, and responsible people.
Reviewed project requirements and their sources.
Workers, credentials, evaluations, and employer decisions.
Actual lift plans, equipment records, and field reviews.
Set up your first project
Receive your access. The person providing your workspace link arranges your account with the account administrator. Sign in with the email address supplied during setup.
Open the private workspace. Sign in and select “Create organization and project,” or accept the invitation for your email address if the project already exists.
Bring in the project team. The GC administrator creates contractors and project invitations, then deliberately assigns employer representatives, reviewers, and the lift director.
Record the project requirements. The responsible reviewer registers the applicable sources and versions, approves their use, and records the requirements for this project.
Add the people and first lift. Contractors add their workers and evidence. The team creates a lift package, assigns the crew and equipment, and adds the actual job documents.
Use the field workflow below. Resolve gaps, record the responsible human decisions, review actual field conditions, and preserve the completed package.
Review upcoming packages, assigned actions, and expiring records.
Before work
Check the current crew and package, carry out the field review, and confirm the designated director's recorded decision.
After work
Record completion, verify closeouts, and preserve the evidence packet.
Actual competence, equipment suitability, engineering, and field conditions require responsible human review. Use the private workspace only after your project requirements and field process have been accepted.